JUPITER, May 4, 2019 – Powerphase has started construction on their Turbophase System Gas Turbine Upgrade in Latin America. The construction will include a foundation, transformer, electrical equipment and 3 Turbophase Modules – a dry air injection system that will add mass flow to the Siemens 501F gas turbine at the power plant, increasing output and operational flexibility.