News

  • News
  • Product Showcase
  • Renewable Energy
  • Videos
News

Turbophase Factory Acceptance Test Stronger than Expected

Jupiter, FL (September 20, 2013) – Powerphase LLC announced today that its recent factory acceptance test of Turbophase was stronger than expected. The Turbophase module exceeded performance estimates and will deliver more power, more efficiently that had been predicted by engineering models.  On a simple cycle 7FA, each Turbophase module will produce about 3.9MW with […]

Read More
News

1st Turbophase Unit Completed Ahead of Schedule

Jupiter, FL (September 16, 2013) – Powerphase LLC announced today that the World’s First Gas Turbine Turbocharger has been manufactured ahead of schedule. The Modular Unit, called Turbophase, will produce approximately 4 MW of power when added to a gas turbine power plant. Turbophase uses air injection to restore power that is normally lost when […]

Read More
News

Bob Kraft invited back to speak at POWER-GEN International 2013

West Palm Beach, (June 21, 2013) – Bob Kraft, Founder & President of Powerphase LLC has been invited back to speak at POWER-GEN International 2013, in Orlando, FL on NOVEMBER 12-14, 2013. Mr. Kraft’s 2012 presentation on Turbophase – Smarter Peaking Power was well-received at POWER-GEN in 2012. In 2013, Mr. Kraft intends to discuss using […]

Read More
News

Powerphase LLC to showcase Turbophase at ASME Turbo Expo 2013

West Palm Beach, (May 20, 2013) – Powerphase LLC will be at the ASME Turbo Expo from Jun 4-6 2013. Founder Bob Kraft & Vice President Pat Conroy will be at the Powerphase booth to tell show attendees about Turbophase – Smarter Peaking Power. Turbophase takes advantage of a well known characteristic of all gas […]

Read More