Analysis of Turbophase System Deployment on Natural Gas Generating Stations Located in Florida Reliability Coordinating Counsel

Download our Whitepaper to learn more about our Turbophase Deployment throughout the state of Florida

The US is seeing resource change driven by environmental policy and public policy where many areas of the US have minimal load growth projections. Although many organizations, regulators, ISO’s, federal departments, labs, consultants, and others are engaged in a multitude of studies for the future grid designs in America. In the past few years, there has been increased recognition that environmental policy and public policy in combination with the vast shale gas developments will lead to the increased reliance of the power sector on natural gas generation.
Thus the study process and the complexity of issues are driving the demand for integrated datasets and integrated models i.e. one software package that can handle all the complexities of planning and operations and market analysis in the short, medium, and long term. The following diagram displays the integrated dataset for the PLEXOS® Integrated Energy Model.

In this Whitepaper you’ll learn about:

  • FRCC Region Inputs & Modeling Assumptions
  • PLEXOS® Simulation Settings
  • 2015 Production cost Simulation Results

Get Your Whitepaper Today

uabb-device-laptop

Please fill out the form below to obtain your free white paper.

"*" indicates required fields

Name*