Powerphase is redefining power optimization and sustainable energy with adaptable solutions that address the most demanding challenges in the energy sector. By injecting innovation into every project, we restore and enhance turbine output, even in extreme climates or at high altitudes. Our trusted technology delivers increased capacity, reduced costs, and long-term sustainability without extensive downtime or costly infrastructure upgrades. Powerphase has deployed 11 TPMs across 5 countries, resulting in over 60,000 hours of runtime, supporting renewables, and achieving measurable impacts worldwide.

usa-project-15

ENHANCING ENERGY EFFICIENCY AT MORRIS FACILITY (CHICAGO, IL)

At the Morris Co-Generation Facility, Powerphase deployed two Turbophase Modules to improve turbine output and overall plant efficiency under extreme temperature conditions ranging from -20°F to 100°F. This installation displaced duct burners, significantly improving efficiency and reducing emissions while delivering consistent economic benefits. The project enhanced operational reliability, ensuring stable performance in varying climates.Turbophase improved the plant regulation score  in PJM markets, increasing by approximately 10%, further maximizing economic returns for the facility. This demonstrates the Turbophase technology's ability to boost both operational capacity and financial outcomes.

  • Delivered 4 MW per Turbophase Module (CCGT), enhancing turbine efficiency while reducing emissions.
  • Increased regulation score in PJM by 10%, resulting in greater regulation payments.
  • Ensured reliability in extreme temperature variations from freezing to scorching conditions.
middle-east-project-14

DELIVERING RESULTS FOR SAUDI ELECTRIC COMPANY (SAUDI ARABIA)

In one of the most challenging environments, Powerphase installed two Turbophase Modules at the Faras Power Station in Saudi Arabia, demonstrating the resilience and efficiency of the solution technology. Despite desert temperatures exceeding 120°F (55°C), the system consistently restored turbine output and enhanced operational performance.

This deployment achieved 97% availability, proving its reliability and adaptability under harsh conditions. By significantly improving efficiency and economic benefits, this project reinforced the effectiveness of Turbophase as a transformative solution for extreme environments.

  • Delivered 4.5 MW per TPM SCGT with 97% availability, optimizing turbine capacity.
  • Improved module efficiency by 0.9%, showcasing incremental performance gains.
  • Enabled economic benefits and reliable operations in high-temperature conditions.
Testing 456

BOOSTING SUSTAINABILITY FOR NUR POWER (PENANG, MALAYSIA)

Powerphase collaborated with NUR Power to install two Turbophase Modules, optimizing turbine performance for daily cycling operations in Malaysia. The installation not only ensured a high availability rate of over 98%, avoiding the cost of a new gas turbine. Thus enabling the plant to grow incrementally as energy demands rise for the high tech park they service. The project marked the first installation of air-cooled modules, demonstrating >98% availability to new environments without affecting the existing system footprint. With over 42,000 combined operating hours, the project exemplifies the durability and efficiency of Turbophase technology in delivering consistent results for long-term energy needs.

  • Delivered 4.2 MW per Turbophase Module with >98% availability.
  • Achieved first air-cooled module installation with no impact on system footprint.
  • Contributed 42,000 combined operating hours with no impact on the existing system.
hero-2

OVERCOMING HIGH-ALTITUDE CHALLENGES AT MT FALCON (SALTILLO, MEXICO)

At the MT Falcon facility in Mexico, Powerphase deployed three Turbophase Modules to enhance turbine output at high altitudes. This installation demonstrated the system's ability to adapt to geographic and environmental challenges while delivering superior performance. As the first-ever financed project and the first F-class turbine installation, this deployment marked a milestone for Turbophase solutions.

  • Delivered 4.3 MW per TPM with the first-ever F-class turbine configuration.
  • Achieved the first financed project, demonstrating the economic feasibility of Turbophase.
usa-project-24

OPTIMIZING ENERGY OPERATIONS FOR ENGRO POLYMER (KARACHI, PAKISTAN)

Powerphase installed a single Turbophase Module at the ENGRO Polymer facility to enhance turbine performance and operational efficiency in Karachi, Pakistan. Operating effectively in high temperatures exceeding 100°F, the installation maintained economic benefits and reliable output for continuous operations. This deployment highlighted the adaptability of Turbophase technology in addressing region-specific energy challenges, ensuring consistent energy supply while optimizing costs. With 2,000 operational hours recorded, the project underlined Turbophase's capability to deliver results in demanding industrial environments.

  • Delivered 3.5 MW per TPM (CCGT), maintaining economic efficiency above 100°F.
  • Ensured 2,000 hours of reliable operation in challenging conditions.
  • Supported continuous energy supply while optimizing resource utilization.
usa-project-14

DRIVING EXPANSION AT FORMOSA PLASTICS (BATON ROUGE, LA)

At Formosa Plastics in Baton Rouge, Louisiana, Powerphase installed one Turbophase Module to support continuous operations and enable facility expansion. This installation delivered 4.5 MW per module and laid the groundwork for scaling up operations. Additionally, this leased module highlighted a flexible, cost-effective approach to energy optimization, allowing Formosa Plastics to expand without significant upfront investments.

  • Delivered 4.5 MW per TPM with continuous base load operations.
  • Demonstrated economic feasibility through a leasing model with long-term benefits.